Home
About us
Projects
Sectors
Project Execution
Railways Infrastructure
Pavement Preservation
Pavement Recycling
Equipment Sector
Concrete & Batching Plant
Concrete Sleeper Production
Concrete Plants
Sustainability
Contact us
Contact Us
All Projects
Home
/
Portfolios
/
All Projects
Duplication of the Railway Line (Bashteel / Al-Ittihad) Section 3: From Wardan to Kafr Dawood
Embankment Works for the Railway Duplication Project(Adly Mansour / Robeiky)
Construction of Fences for the High-Speed Electric Train Project(Ain Sokhna – Matrouh – Fayoum – Green Line)
Protection of Light Rail Transit (LRT) Cable Route
Construction of the Bus Rapid Transit (BRT) Station and Pedestrian Bridge(El-Mosheer Tantawy Station)
Development and upgrading works for Sheikh Mohammed Bin Zayed South Axis, from El-Nassagoon El-Sharqeyoon Square to the Middle Ring Road (6 km), executed by direct order
Completion of the development works for Sector 2 of the Qena/Luxor Eastern Desert Road using pavement layer recycling technology
Completion of the development works for Sector 2 of the Qena/Luxor Eastern Desert Road using pavement layer recycling technology
Upgrading Works for Main Runway 34R/16L at Hurghada International Airport
Upgrading works for the Luxor International Airport Road, 6 km long
Upgrading works for El-Moshir Tantawy Axis, from El-Wafaa & El-Amal Axis to the Ring Road, 4.1 km long
Implementation works for the third phase of the duplication of the Qena/Luxor Eastern Desert Road, from New Tiba–Al-Habeel–Al-Baghdadi Bridge, over a length of 36 km
Implementation works for the third phase of the duplication of the Qena–Luxor Eastern Desert Road, from New Tiba–Al-Habeel–Al-Baghdadi Bridge, including development and upgrading works over a length of 18 km
Upgrading the airfield and addressing the Civil Aviation Authority’s remarks at Port Said Airport
Upgrading of Main Runway 04R/22L, Maintenance of Taxiway A and Connectors, and Construction of Infrastructure and Rainwater Drainage System at Sharm El Sheikh International Airport
Upgrading the main runway, constructing a stormwater drainage system, and establishing an aircraft arresting barrier system for military aircraft at Aswan International Airport
Upgrading works for the Safaga–Qena Road, starting from Safaga Checkpoint, 40 km long (both directions)
Urgent Maintenance Works for the Landside Areasat Sharm El Sheikh and Luxor International Airport Terminal
Implementation of the duplication and development works for the first sector of the Qena/Luxor Eastern Desert Road, approximately 36 km long
Upgrading and rehabilitating the main runway (15/33) and taxiway connections at Sohag International Airport
Urgent Maintenance Project for the Airfield at Sphinx International Airport
Development and upgrading project of the International Coastal Road from Gamasa to Baltim, 50 km long