The Egyptian Company for the Construction and Maintenance of Transportation and Airport Facilities
  • Home
  • About us
  • Projects
  • Sectors
    • Project Execution
      • Railways Infrastructure
      • Pavement Preservation
      • Pavement Recycling
    • Equipment Sector
    • Concrete & Batching Plant
      • Concrete Sleeper Production
      • Concrete Plants
  • Sustainability
  • Contact us
  • English
  • العربية
Contact Us

Portfolio

  • Home
  • /
  • Portfolios
  • /
  • Upgrading works for the Safaga–Qena Road, starting from Safaga Checkpoint, 40 km long (both directions)

Upgrading works for the Safaga–Qena Road, starting from Safaga Checkpoint, 40 km long (both directions)

Scope of Work
  • Milling and removal of failed/collapsed pavement areas.
  • Construction of an asphalt concrete surface layer.
  • Supply and application of a cold asphalt layer with bituminous emulsion using the Micro Surfacing method.
  • Supply of crack-filling materials (Crack Seal).

Client

General Authority for Roads and Bridges

Duration

6 months

Execution Status

Completed

Other Projects

Duplication of the Railway Line (Bashteel / Al-Ittihad) Section 3: From Wardan to Kafr Dawood

Embankment Works for the Railway Duplication Project(Adly Mansour / Robeiky)

Construction of Fences for the High-Speed Electric Train Project(Ain Sokhna – Matrouh – Fayoum – Green Line)

Protection of Light Rail Transit (LRT) Cable Route

Construction of the Bus Rapid Transit (BRT) Station and Pedestrian Bridge(El-Mosheer Tantawy Station)

Development and upgrading works for Sheikh Mohammed Bin Zayed South Axis, from El-Nassagoon El-Sharqeyoon Square to the Middle Ring Road (6 km), executed by direct order

Completion of the development works for Sector 2 of the Qena/Luxor Eastern Desert Road using pavement layer recycling technology

Completion of the development works for Sector 2 of the Qena/Luxor Eastern Desert Road using pavement layer recycling technology

Upgrading Works for Main Runway 34R/16L at Hurghada International Airport

Upgrading works for the Luxor International Airport Road, 6 km long

The Egyptian Company for the Construction and Maintenance of Transportation and Airport Facilities

The Egyptian Company for the Construction and Maintenance of Transportation and Airport Facilities

+2022605520
sales@egysmartroads.com

Sitemap

  • Homepage
  • About us
  • Projects
  • Sectors
  • Sustainability
  • Contact us

Sectors

  • Project Execution
  • Equipment Sector
  • Concrete & Batching Plant

Our Location

Map Image
Cairo, Egypt

Website design hosting Egypt by webegypt.net © Copyright 2025 All rights reserved.