Upgrading works for the Safaga–Qena Road, starting from Safaga Checkpoint, 40 km long (both directions)
Scope of Work
- Milling and removal of failed/collapsed pavement areas.
- Construction of an asphalt concrete surface layer.
- Supply and application of a cold asphalt layer with bituminous emulsion using the Micro Surfacing method.
- Supply of crack-filling materials (Crack Seal).
Client
General Authority for Roads and Bridges
Duration
6 months
Execution Status
Completed