All ProjectsDuplication of the Railway Line (Bashteel / Al-Ittihad) Section 3: From Wardan to Kafr Dawood
All ProjectsConstruction of Fences for the High-Speed Electric Train Project(Ain Sokhna – Matrouh – Fayoum – Green Line)
All ProjectsConstruction of the Bus Rapid Transit (BRT) Station and Pedestrian Bridge(El-Mosheer Tantawy Station)
All ProjectsDevelopment and upgrading works for Sheikh Mohammed Bin Zayed South Axis, from El-Nassagoon El-Sharqeyoon Square to the Middle Ring Road (6 km), executed by direct order
All ProjectsCompletion of the development works for Sector 2 of the Qena/Luxor Eastern Desert Road using pavement layer recycling technology
All ProjectsCompletion of the development works for Sector 2 of the Qena/Luxor Eastern Desert Road using pavement layer recycling technology
All ProjectsUpgrading works for El-Moshir Tantawy Axis, from El-Wafaa & El-Amal Axis to the Ring Road, 4.1 km long
All ProjectsImplementation works for the third phase of the duplication of the Qena/Luxor Eastern Desert Road, from New Tiba–Al-Habeel–Al-Baghdadi Bridge, over a length of 36 km
All ProjectsImplementation works for the third phase of the duplication of the Qena–Luxor Eastern Desert Road, from New Tiba–Al-Habeel–Al-Baghdadi Bridge, including development and upgrading works over a length of 18 km
All ProjectsUpgrading the airfield and addressing the Civil Aviation Authority’s remarks at Port Said Airport
All ProjectsUpgrading of Main Runway 04R/22L, Maintenance of Taxiway A and Connectors, and Construction of Infrastructure and Rainwater Drainage System at Sharm El Sheikh International Airport
All ProjectsUpgrading the main runway, constructing a stormwater drainage system, and establishing an aircraft arresting barrier system for military aircraft at Aswan International Airport
All ProjectsUpgrading works for the Safaga–Qena Road, starting from Safaga Checkpoint, 40 km long (both directions)
All ProjectsUrgent Maintenance Works for the Landside Areasat Sharm El Sheikh and Luxor International Airport Terminal
All ProjectsImplementation of the duplication and development works for the first sector of the Qena/Luxor Eastern Desert Road, approximately 36 km long
All ProjectsUpgrading and rehabilitating the main runway (15/33) and taxiway connections at Sohag International Airport
All ProjectsDevelopment and upgrading project of the International Coastal Road from Gamasa to Baltim, 50 km long