The Egyptian Company for the Construction and Maintenance of Transportation and Airport Facilities
  • Home
  • About us
  • Projects
  • Sectors
    • Project Execution
      • Railways Infrastructure
      • Pavement Preservation
      • Pavement Recycling
    • Equipment Sector
    • Concrete & Batching Plant
      • Concrete Sleeper Production
      • Concrete Plants
  • Sustainability
  • Contact us
  • English
  • العربية
Contact Us

Portfolios

All Projects

Duplication of the Railway Line (Bashteel / Al-Ittihad) Section 3: From Wardan to Kafr Dawood

All Projects

Embankment Works for the Railway Duplication Project(Adly Mansour / Robeiky)

All Projects

Construction of Fences for the High-Speed Electric Train Project(Ain Sokhna – Matrouh – Fayoum – Green Line)

All Projects

Protection of Light Rail Transit (LRT) Cable Route

All Projects

Construction of the Bus Rapid Transit (BRT) Station and Pedestrian Bridge(El-Mosheer Tantawy Station)

All Projects

Development and upgrading works for Sheikh Mohammed Bin Zayed South Axis, from El-Nassagoon El-Sharqeyoon Square to the Middle Ring Road (6 km), executed by direct order

All Projects

Completion of the development works for Sector 2 of the Qena/Luxor Eastern Desert Road using pavement layer recycling technology

All Projects

Completion of the development works for Sector 2 of the Qena/Luxor Eastern Desert Road using pavement layer recycling technology

All Projects

Upgrading Works for Main Runway 34R/16L at Hurghada International Airport

All Projects

Upgrading works for the Luxor International Airport Road, 6 km long

All Projects

Upgrading works for El-Moshir Tantawy Axis, from El-Wafaa & El-Amal Axis to the Ring Road, 4.1 km long

All Projects

Implementation works for the third phase of the duplication of the Qena/Luxor Eastern Desert Road, from New Tiba–Al-Habeel–Al-Baghdadi Bridge, over a length of 36 km

All Projects

Implementation works for the third phase of the duplication of the Qena–Luxor Eastern Desert Road, from New Tiba–Al-Habeel–Al-Baghdadi Bridge, including development and upgrading works over a length of 18 km

All Projects

Upgrading the airfield and addressing the Civil Aviation Authority’s remarks at Port Said Airport

All Projects

Upgrading of Main Runway 04R/22L, Maintenance of Taxiway A and Connectors, and Construction of Infrastructure and Rainwater Drainage System at Sharm El Sheikh International Airport

All Projects

Upgrading the main runway, constructing a stormwater drainage system, and establishing an aircraft arresting barrier system for military aircraft at Aswan International Airport

All Projects

Upgrading works for the Safaga–Qena Road, starting from Safaga Checkpoint, 40 km long (both directions)

All Projects

Urgent Maintenance Works for the Landside Areasat Sharm El Sheikh and Luxor International Airport Terminal

All Projects

Implementation of the duplication and development works for the first sector of the Qena/Luxor Eastern Desert Road, approximately 36 km long

All Projects

Upgrading and rehabilitating the main runway (15/33) and taxiway connections at Sohag International Airport

All Projects

Urgent Maintenance Project for the Airfield at Sphinx International Airport

All Projects

Development and upgrading project of the International Coastal Road from Gamasa to Baltim, 50 km long

The Egyptian Company for the Construction and Maintenance of Transportation and Airport Facilities

The Egyptian Company for the Construction and Maintenance of Transportation and Airport Facilities

+2022605520
sales@egysmartroads.com

Sitemap

  • Homepage
  • About us
  • Projects
  • Sectors
  • Sustainability
  • Contact us

Sectors

  • Project Execution
  • Equipment Sector
  • Concrete & Batching Plant

Our Location

Map Image
Cairo, Egypt

Website design hosting Egypt by webegypt.net © Copyright 2025 All rights reserved.