Implementation of the duplication and development works for the first sector of the Qena/Luxor Eastern Desert Road, approximately 36 km long

Scope of Work
  • Excavation works using mechanical equipment in all types of soil.
  • Supply, loading, and transportation of soil.
  • Supply and spreading of a base layer of graded hard stones resulting from crusher outputs.
  • Supply and spreading of a binder layer of asphalt concrete.
  • Construction of a surface layer of asphalt concrete.
  • Supply and installation of precast pipes with 1 m internal diameter and 6 cm thickness.
  • Construction of a single-face concrete barrier, 90 cm high.
  • Construction of a double-face concrete barrier, 90 cm high.
  • Supply and casting of plain concrete, 15 cm thick, for protective works.
  • Construction of a stabilized base layer, 25 cm thick.
  • Construction of a cold-recycled asphalt binder layer.
  • Crack filling works using crack seal materials.
  • Milling and removal of failed/collapsed pavement areas.

Client

General Authority for Roads and Bridges

Duration

12 months

Execution Status

Completed