Implementation works for the third phase of the duplication of the Qena/Luxor Eastern Desert Road, from New Tiba–Al-Habeel–Al-Baghdadi Bridge, over a length of 36 km

Scope of Work
  • Construction of a 6 cm thick hot-laid asphalt concrete binder layer after compaction.
  • Construction of a 5 cm thick asphalt concrete surface layer.
  • Supply and construction of a single-face reinforced concrete barrier (New Jersey type), 90 cm high, using fiberglass.
  • Construction of a 25 cm thick stabilized base layer.
  • Construction of a cold-recycled asphalt binder layer.
  • Opening, cleaning, and filling cracks using crack seal materials.
  • Milling and removal of failed or creeping pavement areas.

Client

General Authority for Roads and Bridges

Duration

12 months

Execution Status

Completed