Upgrading works for El-Moshir Tantawy Axis, from El-Wafaa & El-Amal Axis to the Ring Road, 4.1 km long

Scope of Work
  • Milling and removal of failed/collapsed pavement areas.
  • Construction of a 25 cm thick stabilized base layer (FDR).
  • Construction of a 20 cm thick stabilized base layer (FDR).
  • Supply and spreading of a 6 cm thick asphalt concrete binder layer after compaction.
  • Supply and spreading of a 5 cm thick asphalt concrete surface layer.
  • Supply and spreading of thermal geogrid mesh for cracks.
  • Milling

Client

General Authority for Roads and Bridges

Duration

6 months

Execution Status

Completed