Scope of Work
  • Filling cracks with approved crack-sealing material in the aircraft parking areas and the main runway.
  • Painting the main runway, taxiway connections, and asphalt areas surrounding aircraft parking stands.
  • Repainting the navigational markings for the main runway, aircraft parking areas, and taxiway connections.
  • Treating through-cracks in the concrete slabs in the apron (tarmac) area.
  • Adjusting surface levels and treating the surface of concrete slabs in the apron (tarmac) area.
  • Repairing and rehabilitating the edges and corners of damaged concrete slabs in the apron area.

Client

The Egyptian Airports Company

Duration

3 months

Execution Status

Under implementation