Implementation works for the third phase of the duplication of the Qena–Luxor Eastern Desert Road, from New Tiba–Al-Habeel–Al-Baghdadi Bridge, including development and upgrading works over a length of 18 km

Scope of Work
  • Excavation works using mechanical equipment for all types of soil.
  • Loading and transporting suitable fill soil to achieve the design level for the bridge and shoulders.
  • Supply and spreading of a base layer of graded hard stones resulting from crusher outputs.
  • Supply and spreading of a binder layer of asphalt concrete.
  • Supply and spreading of a surface layer.
  • Supply and installation of precast pipe culverts with 1 m internal diameter.
  • Supply and construction of a single-face reinforced concrete barrier (New Jersey type), 90 cm high.
  • Supply and construction of a double-face reinforced concrete barrier with fiberglass (New Jersey type), 90 cm high.
  • Supply and casting of plain concrete, 15 cm thick.

Client

General Authority for Roads and Bridges

Duration

12 months

Execution Status

Completed