Scope of Work
  • Milling with a constant thickness of 5 cm for parts of the runway, apron, and taxiway connections.
  • Cutting and removing the old asphalt layer from the apron and taxiway connections.
  • Constructing a stabilized base layer with a thickness of 30 cm on the existing layers
  • Constructing a binder layer with a thickness of 5 cm in the required areas
  • Applying a micro-surfacing layer on the runway, connections, and apron.
  • Repairing cracks after milling operations
  • Installing polyester mesh reinforcement in defective areas
  • Re-marking and painting navigational markings on the runway and apron
  • Applying a protective treatment layer to strengthen the surface in certain areas of the runway and apron
  • Treating through-cracks in concrete slabs
  • Constructing joints between concrete slabs
  • Leveling surfaces and repairing concrete slab surfaces

Client

Egyptian Airports Company

Duration

8 months

Execution Status

Completed